

Horten 229 Reconstruction Project
News:
What is achieved so far:
2011
• Related literature obtained and studied.
2012
• Key authors of Horten 229 related books have been contacted for the initial feedback.
• Technical drawings & important archive materials obtained and reviewed. Additional non-critical archive materials will be reviewed when available.
• Aviation consultant found.
• Agreement with M Art Inc on main production facility in Queens City is finalized. Staff & assets on stand-by, ready for the production.
• Agreement with technical designer is finalized. Technical designer is in the process of reviewing and converting archived drawings of Ho 229 V3 into CAD / Solidworks.
• Local airport with an industrial hangar for the final aircraft assembly and runways that are long enough is found.
• Video production process is shaping up.
• Search for project funding started.
Current Development:
FOLLOW US
SPONSORS OF HORTEN 229 PROJECT
Yes, You Can Advertise On Our Aircraft!
If you or your company are interested in the commercial aspects of this project, visit Commercial section for more information.
Your
Logo
Here