Horten 229 Reconstruction Project​
News:​​​​
What is achieved so far:​​​​​​
2011
• Related literature obtained and studied.
2012
• Key authors of Horten 229 related books have been contacted for the initial feedback.
• Technical drawings & important archive materials obtained and reviewed. Additional non-critical archive materials will be reviewed when available.
• Aviation consultant found.
• Agreement with M Art Inc on main production facility in Queens City is finalized. Staff & assets on stand-by, ready for the production.
• Agreement with technical designer is finalized. Technical designer is in the process of reviewing and converting archived drawings of Ho 229 V3 into CAD / Solidworks.
• Local airport with an industrial hangar for the final aircraft assembly and runways that are long enough is found.
• Video production process is shaping up.
• Search for project funding started.​
Current Development:​​​​​​